I am always amazed how fast precast goes up. They can erect the panels for a 100,000 sq ft warehouse in a little over a week with favorable weather conditions. There is still a lot of finishing work, including caulking between the panels but it’s a pretty dramatic change from the steel structure to a mostly enclosed building.
This picture is of my Agrocrop Exports Ltd. project in Bolton ON and was taken on 2016-09-29.